Basic Specifications
Aluminium Profile
60 Series
Certification
CE, ISO, BV, SGS
Surface Finishing
Powder Coating, Anodized, Customized
Deep Processing
Punching, Drilling, Tapping, Bending
MOQ
500kg for Each Profile
Capacity
30,000,000 Kilograms
Product Description
| Technical Parameters |
| Item | Aluminium 6063 T6 Tube Anodized Aluminium Micro Channel Tube |
| Material | 6063/6063A/6061 |
| Size/Thickness | Thickness 0.7-4.0mm, Length 3m-6.4m or Customized |
| Anodize Protection | Thickness 8-18um, Powder Coating 40-100um |
| Shape | Customized, Rectangular, Round, Square |
| Application | Windows, Doors and Industrial use |
| Packing Details | Plastic protective film inside; Plastic film or craft paper outside |
Chemical Composition (%)
| Alloy | Si | Fe | Cu | Mg | Zn | Al |
| 6063 | 0.2-0.6 | 0.25-0.35 | 0.1 | 0.45-0.8 | 0.1 | Remainder |
| 6061 | 0.4-0.8 | 0.65-0.72 | 0.2-0.38 | 0.8-1.2 | 0.25 | Remainder |
| 6063A | 0.3-0.6 | 0.18-0.25 | 0.15 | 0.6-0.9 | 0.15 | Remainder |
We can provide nuts and bolts or other aluminum accessories together with the aluminum profile based on your requirements.
Through years of effort, we have grown into an enterprise with a strong reputation for high-quality aluminum profiles. We have advanced production equipment for casting, extrusion, die casting, and surface treatment. Product quality is regarded as the utmost factor, supported by rigid quality management and specialized design according to customer drawings and samples.
Frequently Asked Questions
What are your payment terms?
We accept T/T (Telegraphic Transfer) or L/C (Letter of Credit).
What is the Minimum Order Quantity (MOQ)?
The MOQ is 500kgs for each individual item or profile.
Does the price vary by color?
Yes, different surface treatments and colors have different pricing structures.
Can you provide samples?
Yes. Existing color samples are available in 5 days, while new custom samples take approximately 15 days.
How are the products packaged?
We use pad pasting and kraft paper or shrink films to ensure protection during transport.
What is the expected delivery time?
Sample testing takes 15-17 days. Full production is typically completed 25-30 days after sample confirmation.